Maintenance Engineering Services contract awarded by Hyundai Engineering & Construction for Habshan 5 project within Integrated Gas Development Project – Abu Dhabi, UAE |
|
August 2011 |
|
The Abu Dhabi Integrated Gas Development Project aims to increase Habshan field processing capacity. All project facilities are planned to be installed through five separate EPC Packages. Within the Habshan 5 Utilities & Offistes Package, Hyundai E&C assigned to CEng a contract for Maintenance Engineering Services that includes the following activities:
- MEL development;
- RCM Analysis;
- CMMS Data Base Implementation.
The duration of the activities is foreseen to be 12 months.
|